skip to content.

Mackenzie Valley Review Board

The Mackenzie Valley Environmental Impact Review Board's mission is to conduct quality and timely environmental impact assessments that protect the environment and the social, economic and cultural well being of the residents of the Mackenzie Valley and all Canadians

Review Board 101

Disclaimer: Some of the information in this Public Registry is provided by external sources. The Review Board is not responsible for the content of any Submission posted on the Public Registry. A Submission represents the views and opinions of the person or organisation making the Submission. It does not represent the views or opinions of the Review Board.

The posting of a Submission on the Public Registry does not determine either the relevance or weight that will be accorded to the Submission by the Review Board.

Ranger Oil Ltd./Canadian Forest Oil Ltd./Chevron Oil Resources Ltd. Integrated P-66A/N61/K-29 Gas Wells and Pipeline Tie-in - EA99-0061/0086 [1999]

Project Description

The development proposal consisted of two gas wells, one produced water injection well, a sour gas pipeline, a produced water pipeline (in a common trench with the gas line), one all season road and all construction and operation activities associated with the road and wells near Fort Liard.

Type: Environmental assessment - Completed and finalized

Document Summary

Preliminary screening
EA start up
1Scoping
Terms of Reference
Developer's Assessment Report
Information requests
Technical sessions
Technical reports
Pre-hearing conference
Public hearings
1Report of Environmental Assessment
Post REA materials and consult to modify
1Minister's decision and final measure
Additional information
Hearing follow-up
Report of Environmental Review
Post-REIR materials and Consult to Modify
3Total Number of Documents

MVEIRB - Documents for EA99-0061/0086 Integrated P-66A/N61/K-29 Gas Wells and Pipeline Tie-in Web Feed: Documents for this project.