Disclaimer: Some of the information in this Public Registry is provided by external sources. The Review Board is not responsible for the content of any Submission posted on the Public Registry. A Submission represents the views and opinions of the person or organisation making the Submission. It does not represent the views or opinions of the Review Board.

The posting of a Submission on the Public Registry does not determine either the relevance or weight that will be accorded to the Submission by the Review Board.

Imperial Oil Resources Ventures Ltd. Mackenzie Gas Project - EIR0405-001 [2004]

Project Description

This proposed project is a 1220-kilometre natural gas pipeline system along the Mackenzie Valley which will connect natural gas production from three fields in the Mackenzie Delta to the existing pipeline grid in Alberta.

After the environmental assessment of this project was completed it was referred by the Review Board to an environmental review. Because of the transboundary nature and scale of the project, the review was conducted by the Joint Review Panel, set up under the Inuvialuit Final Agreement, the Canadian Environmental Assessment Act and the Mackenzie Valley Resource Management Act. The Joint Review Panel published its completed report on December 30, 2009, which may be downloaded here.

Type: Environmental impact review - Completed and waiting for a ministerial decision

Status: Environmental impact review complete; waiting for ministerial approval

Document Summary

Preliminary screening
EA start up
Scoping
Terms of Reference
Developer's Assessment Report
Information requests
Technical sessions
Technical reports
Pre-hearing conference
Public hearings
Report of Environmental Assessment
Post REA materials and consult to modify
Minister's decision and final measure
4Additional information
Hearing follow-up
6Report of Environmental Review (current stage)
Post-REIR materials and Consult to Modify
10Total Number of Documents