Giant Mine Remediation Project - EA0809-001 [2008]
0.3 MBClosing comments- Developer
These are the closing comments from the developer.
| Received: | Oct 11, 2012 |
|---|---|
| Document Date: | Oct 12, 2012 |
| Originator: | Developer |
| Public Registry: | 611 |
0.03 MBNote to File re: participation of Board member John Curran
This is a Note to File regarding the participation of Board member John Curran in this environmental assessment.
| Received: | Oct 9, 2012 |
|---|---|
| Document Date: | Oct 9, 2012 |
| Originator: | Review Board |
| Public Registry: | 609 |
0.6 MBClosing comments- NSMA
There are the closing comments from the NSMA.
| Received: | Oct 5, 2012 |
|---|---|
| Document Date: | Oct 5, 2012 |
| Originator: | |
| Public Registry: | 606 |
0.1 MBClosing comments- YKDFN
There are the closing comments from the YKDFN.
| Received: | Oct 5, 2012 |
|---|---|
| Document Date: | Oct 5, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 605 |
0.1 MBClosing Statement- DFO
This is the closing statement from DFO.
| Received: | Oct 5, 2012 |
|---|---|
| Document Date: | Oct 5, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 608 |
0.1 MBLetter from Mike Mitchell
This is a letter from Mike Mitchell, member of the public.
| Received: | Oct 4, 2012 |
|---|---|
| Document Date: | Oct 4, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 604 |
0.1 MBCommunity hearing presentation- Terry Pamplin
This is the text of the story by Margret Atwood read in the presentation by Terry Pamplin at the Giant hearing on Tuesday Sept. 11, 2012.
| Received: | Oct 1, 2012 |
|---|---|
| Document Date: | Sep 11, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 602 |
0.6 MBClosing comments- Alternatives North
There are the closing comments from Alternatives North
| Received: | Sep 26, 2012 |
|---|---|
| Document Date: | Sep 26, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 607 |
0.2 MBUndertaking #1 and cover letter
This the developer's cover letter and undertaking #1 from the hearing..
| Received: | Sep 25, 2012 |
|---|---|
| Document Date: | Sep 25, 2012 |
| Originator: | Developer |
| Public Registry: | 595 |
0.2 MBUndertaking #3: Identifying water treatment plant BAPT
This is Undertaking #3 from the developer, regarding best available practical technology for the water treatment plant (per day 5 transcript, pages 153-155)
| Received: | Sep 25, 2012 |
|---|---|
| Document Date: | Sep 25, 2012 |
| Originator: | Developer |
| Public Registry: | 596 |
0.06 MBUndertaking #4: Design schedule and steps
This is Undertaking # 4 from the developer. It describes the steps and schedule for further design of parts of the project (per hearing day 5 transcript, p170-177).
| Received: | Sep 25, 2012 |
|---|---|
| Document Date: | Sep 25, 2012 |
| Originator: | Developer |
| Public Registry: | 598 |
0.04 MBLetter from Erin Suliak
This is a letter from Erin Suliak, member of the public.
| Received: | Sep 24, 2012 |
|---|---|
| Document Date: | Sep 24, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 584 |
0.3 MBLetter from Erica Janes
This is a letter from Erica Janes, member of the public.
| Received: | Sep 23, 2012 |
|---|---|
| Document Date: | Sep 23, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 582 |
0.2 MBLetter from Wendy Lahey
This is a letter from Wendy Lahey, member of the public.
| Received: | Sep 23, 2012 |
|---|---|
| Document Date: | Sep 19, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 583 |
0.6 MBDiscussion paper on Giant oversight considerations
This is a discussion paper titled "Considerations Regardign the Establishmnet of an Environmental Monitoring Committee for the Giant Mine Remediation Project". It is Exhibit 11 in the Giant hearing.
| Received: | Sep 22, 2012 |
|---|---|
| Document Date: | May 18, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 599 |
0.1 MBLetter from Leslie Wakelyn
This is a letter from Leslie Wakelyn, member of the public.
| Received: | Sep 19, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 585 |
3 MBGiant Mine heaing transcripts - September 11, 2012
This document contains transcripts from the public hearing held September 11, 2012.
| Received: | Sep 17, 2012 |
|---|---|
| Document Date: | Sep 17, 2012 |
| Originator: | Review Board |
| Public Registry: | 576 |
3 MBGiant Mine hearing transcript - September 12, 2012
Transcript of Day 3, September 12, 2012, of the Public Hearing for the Giant Mine EA, held in Yellowknife at the Tree of Peace.
| Received: | Sep 17, 2012 |
|---|---|
| Document Date: | Sep 12, 2012 |
| Originator: | Review Board |
| Public Registry: | 577 |
2 MBGiant Mine hearing transcripts - September 10, 2012
This document contains transcripts from the public hearing held September 10, 2012.
| Received: | Sep 17, 2012 |
|---|---|
| Document Date: | Sep 17, 2012 |
| Originator: | Review Board |
| Public Registry: | 575 |
2 MBGiant Mine public hearing transcript - Sept 13, 2012
Transcript of Day 4, September 13, 2012, of the Giant Mine public hearing held in Yellowknife at the Tree of Peace.
| Received: | Sep 17, 2012 |
|---|---|
| Document Date: | Sep 13, 2012 |
| Originator: | Review Board |
| Public Registry: | 578 |
2 MBGiant Mine public hearing transcript - September 14, 2012
Transcript of Day 5, Sept 14, 2012, of the Giatn Mine public hearing held in Yellowknife at the Tree of Peace
| Received: | Sep 17, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Review Board |
| Public Registry: | 579 |
0.05 MBComparison of diffusers and mixing zones
This is a memo from Golder Associates prepared for the developer comparing diffusers and mixing zones. It is hearing Exhibit 10.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 600 |
1 MBContaminated Sites Program Performance Report 2007-2008
This is the Northern Affairs Organziation Contaminated Sites Program Performance Report 2007-2008. It was submitted by the developer as is Exhibit 1 in the Giant hearing.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Review Board |
| Public Registry: | 587 |
2 MBContaminated Sites Program Performance Report 2008-2009
This is the Northern Affairs Organziation Contaminated Sites Program Performance Report 2008-2009. It was submitted by the developer as is Exhibit 2 in the Giant hearing.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 588 |
1 MBContaminated Sites Program Performance Report 2009-2010
This is the Northern Affairs Organziation Contaminated Sites Program Performance Report 2009-2010. It was submitted by the developer as is Exhibit 3 in the Giant hearing.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 589 |
1 MBContaminated Sites Program Performance Report 2010-2011
This is the Northern Affairs Organziation Contaminated Sites Program Performance Report 2010-2011. It was submitted by the developer as is Exhibit 4 in the Giant hearing.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 590 |
5 MBGuidelines for the Discharge of Treated Municipal Wastewater in the NWT
This is the NWT Water Board's 1992 Guidelines for the Discharge of Treated Municipal Wastewater in the NWT. It is part of hearing exhibit 9.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 593 |
0.2 MBLetter from Carol Lafontaine
This is a letter from Carol Lafontaine, member of the public.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 581 |
0.2 MBLetter from Caroline Lafontaine, Yellowknife resident
This is a letter submitted by Caroline Lafontaine describing concerns with the Giant Mine Remediation Project.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Other |
| Public Registry: | 580 |
0.9 MBMVLWB Water anf Effluent Quality Management Policy
This is the Mackenzie Valley Land and Water Board's Water anf Effluent Quality Management Policy. It is one of three parts of hearing Exhibit 9.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Mar 31, 2011 |
| Originator: | Developer |
| Public Registry: | 592 |
2 MBResponse to AN IR#10 round 2
This the developer's response to Alternatives North's Round 2 IR #10. It includes a summary report by Golder Associates describing the preliminary diffuser design. This is part of hearing Exhibit 9.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 594 |
0.1 MBUndertaking #2: Health Canada comments
This is Undertaking #2 from the developer. It includes three documents from Health Canada. (per hearing day 2 transcript, pages 220-233). Parts of this document are also identified as hearing Exhibit 8.
| Received: | Sep 14, 2012 |
|---|---|
| Document Date: | Sep 14, 2012 |
| Originator: | Developer |
| Public Registry: | 591 |
0.2 MBHearing presentation my Bob Bromley, MLA
This is the Sept. 11 2012 hearing presentation by Bob Bromley, MLA for Weledeh.
| Received: | Sep 13, 2012 |
|---|---|
| Document Date: | Sep 11, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 603 |
0.8 MBReport on Yellowknife Water Supply Line (1968)
This is a 1968 Report on the Town of Yellowknife Water Supply Line by DIAND. It was submitted by City of Yellowknife in response to hearing discussions (per Sept. 13 2012 hearing transcript pages 74-75)
| Received: | Sep 13, 2012 |
|---|---|
| Document Date: | Sep 13, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 601 |
0.2 MBAlternatives North Backgrounder
This document describes Alternatives North's background and membership. It was submitted in response to a Board request at the hearing.
| Received: | Sep 12, 2012 |
|---|---|
| Document Date: | Sep 12, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 586 |
0.05 MBBackground on Alternatives North
This document, labelled Exhibit 5,was submitted by Alternatives North to the Review Board during the September 12, 2012 public hearings and describes the background on Alternatives North.
| Received: | Sep 12, 2012 |
|---|---|
| Document Date: | Sep 12, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 574 |
0.05 MBLetter - YKDFN to DIAND Minister J. Chretien - Sept 1973
This is a letter dated September 25, 1973 from Yellowknives Dene First Nation to Minister J. Chretien, DIIAND re: arsenic contaminated water from Giant Mine in Yellowknife Bay submitted to the Board at community hearing in Dettah Sept 12, 2012.
| Received: | Sep 12, 2012 |
|---|---|
| Document Date: | Sep 25, 1973 |
| Originator: | Parties/Public |
| Public Registry: | 573 |
0.09 MBLetter - YKDFN to DIAND, Minister Stewart - April 8, 1999
This is a letter from the Yellowknives Dene First Nation to Jane Stewart, Minister of Indian Affairs and Northern Development re: closure and reclamation of the Giant Mine submitted to the Review Board at the Dettah Community Hearing Sept 12, 2012.
| Received: | Sep 12, 2012 |
|---|---|
| Document Date: | Apr 8, 1999 |
| Originator: | Parties/Public |
| Public Registry: | 572 |
0.2 MBGIANT Mine Remediation Project Hearing and Shuttle Schedule
This is the hearing schedule and the shuttle schedule.The shuttle goes between Dettah and Yellowknife everyday of the hearing.
| Received: | Sep 6, 2012 |
|---|---|
| Document Date: | Sep 6, 2012 |
| Originator: | Review Board |
| Public Registry: | 568 |
3 MBDeveloper's freeze + underground hearing presentation (Day 1)
This is the developer's freeze and underground hearing presentation (Day 1)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Developer |
| Public Registry: | 561 |
0.7 MBDeveloper's hearing presentation- Oversight (day 5)
This is the developer's hearing presentation on oversight (day 5)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Developer |
| Public Registry: | 565 |
1 MBDeveloper's hearing presentation- Perpetual care (day 4)
This is the developer's hearing presentation on perpetual care (day 4)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Developer |
| Public Registry: | 564 |
6 MBDeveloper's hearing presentation- Surface (day 3)
This is the developer's hearing presentation on surface (day 3)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Review Board |
| Public Registry: | 563 |
2 MBDeveloper's hearing presentation- water (day 2)
This is the developer's hearing presentation on water (day 2)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Developer |
| Public Registry: | 562 |
3 MBDeveloper's project overview hearing presentation
This is the developer's project overview hearing presentation (Day 1)
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Developer |
| Public Registry: | 560 |
0.1 MBNote to File + email re: YKDFN hearing presentations
This is a Note to File and e-mail regarding YKDFN hearing presentations.
| Received: | Aug 31, 2012 |
|---|---|
| Document Date: | Aug 31, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 559 |
2 MBCity of Yellowknife Hearing Presentations
This file contains four hearing presentations by the City of Yellowknife.
| Received: | Aug 30, 2012 |
|---|---|
| Document Date: | Aug 30, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 557 |
0.01 MBExtension for developer's hearing presentation
This correspondence from the Review Board specifies that the developer has until 5:00 pm on Friday August 31st, 2012 to submit its hearing presentations.
| Received: | Aug 29, 2012 |
|---|---|
| Document Date: | Aug 29, 2012 |
| Originator: | Review Board |
| Public Registry: | 556 |
2 MBGiant Mine Brochure
This document is a brochure sponsored by Alternatives North, the City of Yellowknife and Ecology North for the upcoming Public Hearing.
| Received: | Aug 29, 2012 |
|---|---|
| Document Date: | Aug 28, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 555 |
0.6 MBYKDFN Note on Giant Public Hearing Submissions
This is an e-mail from the YKDFN stating its intent to present at the Public Hearing on Monday, September 10, 2012.
| Received: | Aug 29, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 549 |
0.6 MBAlternatives North Expert CVs
The following document contains CVs for experts presenting on behalf of Alternatives North at the Giant Mine Public Hearing: Dr. Natashe Affolder, Duncan Kenyon, John Kuyek, Karen LeGresley Hamre, and Kevin O'Reilly.
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 544 |
3 MBAlternatives North Expert Public Hearing Presentations
A collection of presentations by AN experts for the GMRP Public Hearings. Includes 1. Affolder - Independent Oversight; 2. Kenyon - Perpetual Care Funding; 3. Kuyek - Perpetual Care; and 4. LeGresley Hamre - Designation Options.
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 543 |
2 MBAlternatives North Public Hearing Presentations
A collection of presentations by AN for the GMRP Public Hearings. Includes 1. Opening Remarks; 2. Frozen Block and Underground; 3. Water Treatment and Mgmt; 4. Surface Remediation; 5. Perpetual Care; and 6. Monititoring and Independent Oversight
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 542 |
0.2 MBCover Letter for AN Public Hearing Submissions
Alternatives North cover letter for the Giant Mine Remediation Project environmental assessment public hearing. Includes questions about participant funding and submission of an update on the Freeze Optimization Study.
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 541 |
1 MBDepartment of Fisheries and Oceans Public Hearing Presentations
A collection of presentations by DFO for the GMRP Public Hearings. Includes: 1. Flow and Diffuser; 2. Baker and Tailings; and 3. Monitoring.
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 546 |
0.2 MBEnvironment Canada Public Hearing Presentations
A collection of presentations by EC for the GMRP Public Hearings. Includes 1. Cover Letter; 2. Introduction Presentation; 3. Water Effluent Presentation; and 3. Air Quality, WIldlife, Tailings and Baker Creek Presentation.
| Received: | Aug 22, 2012 |
|---|---|
| Document Date: | Aug 22, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 545 |
0.3 MBClosure of Public Record
This letter from the Review Board to parties announces the closure of the public record after August 31st 2012.
| Received: | Aug 13, 2012 |
|---|---|
| Document Date: | Aug 13, 2012 |
| Originator: | Review Board |
| Public Registry: | 491 |
0.2 MBGiant EA Hearing Agenda
This is the revised agenda for the Giant EA hearings from Sept. 10-14 2012 in Yellowknife and Dettah NT.
| Received: | Aug 13, 2012 |
|---|---|
| Document Date: | Aug 13, 2012 |
| Originator: | Review Board |
| Public Registry: | 527 |
0.5 MBDraft hearing agenda and letter
This is the draft agenda for the Giant EA hearings. It includes a covering letter with additonal hearing instructions and upcoming deadlines.
| Received: | Aug 3, 2012 |
|---|---|
| Document Date: | Aug 3, 2012 |
| Originator: | Review Board |
| Public Registry: | 485 |
0.2 MBAN e-mail re: PHC, hearing info needs, issues and timing
This e-mail from Alternatives North describes expected documents, issues and timing requirements for the hearing.
| Received: | Jul 27, 2012 |
|---|---|
| Document Date: | Jul 27, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 483 |
0.2 MBGiant Mine pre-hearing conference - call in numbers
Pre-hearing conference: The call in number is 1-888-619-1583. The participant code is 748 631 0459.
| Received: | Jul 26, 2012 |
|---|---|
| Document Date: | Jul 26, 2012 |
| Originator: | Review Board |
| Public Registry: | 481 |
0.009 MBAN e-mail July 25- re: Committments Table
This is e-mail correspondence from Alternatives North regarding an updated table of comittments and the developer's responses to technical reports.
| Received: | Jul 25, 2012 |
|---|---|
| Document Date: | Jul 25, 2012 |
| Originator: | Parties/Public |
| Public Registry: | 484 |
0.5 MBPre-hearing conference letter and agenda
This letter from the Review Board describes the upcoming pre-hearing conference. It includes an agenda.
| Received: | Jul 25, 2012 |
|---|---|
| Document Date: | Jul 25, 2012 |
| Originator: | Review Board |
| Public Registry: | 480 |
0.02 MBNote to File- Hearing no sooner than mid-May
This Note to File describes the developer advising the Board that it will be ready for hearings no sooner than mid-May 2012.
| Received: | Mar 5, 2012 |
|---|---|
| Document Date: | Mar 5, 2012 |
| Originator: | Review Board |
| Public Registry: | 400 |
Total Number of Documents: 64