Jay Project - EA1314-01

Document List - Developer's Assessment Report/Environmental Impact Statement

Displaying 188 documents.
2.89 MB

This is the presentation from the Cultural Workshop Report, Appendix A.

216.2 KB

This is the Cultural Workshop Report from February 25, 2015.

303.11 KB

This is the agenda for the Dominion Diamond Aboriginal Culture Workshop scheduled for February 25.

596.13 KB

This is the Reasons for Decision on the Adequacy of the Jay Project Developer's Assessment Report.

1.83 MB

This document contains follow-up responses and commitments from the December 2014 engagement meetings, submitted by Dominion

17.4 MB

This is the Human and Health Risk Assessment Appendices Report submitted by Dominion Diamond in response to the Adequacy Review.

8.01 MB

This is the Human and Health Risk Assessment Report submitted by Dominion Diamond in response to the Adequacy Review.

286.6 KB

This document contains adequacy review responses submitted by Dominion Diamond.

409.92 KB

This is a letter from the Review Board to Dominion re Adequacy of caribou modeling.

1.35 MB

This is the Russell energy-protein model presentation shown by Don Russell at the January 19, 2015 caribou technical meeting.

6.72 MB

This is the DAR energy model presentation shown by Dominion at the January 19, 2015 caribou technical meeting.

540.55 KB

This document contains summary notes from the caribou technical meeting on January 19, 2015.

12.76 MB

Adequacy Review responses from Dominion Vol 6 of 6 Thermal Assessment for Misery Pit Lake.

3.68 MB

Adequacy Review responses submitted by Dominion Vol 5 of 6 Accidents and Malfunctions Risk Assessment.

29.8 MB

Adequacy Review responses from Dominion Vol 4 of 6 Lac De Gras Hydrodynamic Model updates.

16.77 MB

Adequacy Review responses submitted by Dominion Vol 3 of 6 Air quality assessment update.

273.04 KB

Adequacy Review Responses from Dominion volume 2 of 6, Socio-economic.

5.15 MB

Adequacy Review responses from Dominion, Volume 1 of 6.

1.33 MB

Rangifer volume 34, 2014 - Special Issue No. 22 White et al, submitted by an independent consultant, Don Russell.

2.15 MB

This is the energy-protein and population modeling for the Kiggavik Project (NIRB review) submitted by an independent consultant, Don Russell.

194.43 KB

This is the CV for Don Russel who will participate in the modeling technical meeting as an independent consultant.

84.01 KB

This is the agenda for a technical meeting on protein-energy modeling.

552.42 KB

This Note to File describes the differences between an Adequacy Review and a Conformity Check.

2.87 MB

Dominion responses to sections 4.2, 8.1 and 9.6 of the Review Board's Adequacy Review document dated November 28, 2014.

892.37 KB

This is a letter from the GNWT to the Review Board regarding the departmental participation of the GNWT.

263 KB

This is a letter from Dominion Diamond to the Review Board regarding timing of reponses to the Developer's Assessment Report adequacy review.

4.18 MB

This is the presentation for fish and fish habitat for the DDEC regulator information sessions.

16.45 MB

DDEC regulator meeting Dec 11th and 12th 2014

2.69 MB

DDEC regulator meeting Dec 11th and 12th 2014

3.26 MB

DDEC regulator meeting Dec 11th and 12th 2014

1.4 MB

DDEC regulator meeting Dec 11th and 12th 2014

1.48 MB

DDEC regulator meeting Dec 11th and 12th 2014

1.13 MB

DDEC regulator meeting Dec 11th and 12th 2014

6.15 MB

DDEC regulator meeting Dec 11th and 12th 2014

2.1 MB

Regulator meeting Dec 11th and 12th 2014

26.02 MB

This is the Jay Developer's Assessment Report Addendum - Cumulative Effects including Sable Pit. It addresses item 5.1 of the Review Board's Adequacy Review.

76.96 KB

This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.

8.34 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.

21.93 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part C.

21.32 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part B.

22.98 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part A.

16.87 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 1: Proposed Dikes, Part D.

38.54 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 1: Proposed Dikes, Part C.

38.46 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 1: Proposed Dikes, Part B.

28.84 MB

This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 1: Proposed Dikes, Part A.

240.82 KB

This is the resume for Neil Hutchinson, the aquatics technical advisor to the Review Board.

167.33 KB

This is the CV for Kathy Racher, the Review Board's technical advisor for water quality and quantity.

410.81 KB

This is the cover letter for the Jay Project DAR.

721.04 KB

This is the Review Board's Adequacy Review of the Jay Project Developer's Assessment Report.

252.5 KB

This a a letter and agenda from Dominion for the December 11-12 Information Sessions for the Jay Devveloper's Assessment Report.

149.23 KB

This is the resume for Anne Gunn, the Review Board's techncial advisor for caribou for the Jay Project.

81.94 KB

This is the CV for the Review Board's geotechnical consultant, Bryan Watts, from Klohn Crippen Berger Ltd.

359.22 KB

This Note to File advises parties of the submission of the Developer's Assessment Report and describes next steps.

2.64 MB

2.7 MB

10.03 MB

34.56 MB

21.03 MB

35.82 KB

27.05 KB

259.65 KB

This Note to File is an update on the Jay Project.